GlossaryMaterial Flow & WIP

Lead Time

Time from the start of an order in production to its completion, including all waiting and dwell times.

Relevance on the shop floor

Often, most of the lead time is not spent on processing but on waiting in buffers. The more material sits between steps, the longer it takes on average for an order to be completed (Little’s Law).

Reducing stock and dwell times between steps therefore shortens lead time and improves delivery performance.

AC4DC

What AC4DC contributes

AC4DC makes stock and dwell times between production steps visible, showing where lead time is lost.