GlossaryMaterial Flow & WIP

Occupancy and Fill Level

Number of handling units on a storage bin in relation to its maximum permitted occupancy.

Relevance on the shop floor

If a buffer is full, the upstream process backs up. If it is empty, the downstream process stops. Seeing occupancy makes it possible to react in time.

AC4DC

What AC4DC contributes

AC4DC shows the occupancy of each storage bin as a number or as a chart that changes color at defined fill levels. A maximum occupancy prevents overbooking.